Energy as a Service

From equipment purchase to measured energy-saving retrofit.

Owners do not need only another electrical equipment package. They need a retrofit that can be approved with a clear business case, installed within a controlled outage window, measured transparently after commissioning and supported through stable long-term operation.

3D EaaS energy-saving retrofit scene with MV Drive E-House, EMS room and industrial process loads

Structured retrofit model

MV Drive E-House, EMS measurement and lifecycle service managed as one program.

EHOUSE EaaS converts MV auxiliary-load retrofit from a one-time equipment purchase into an integrated program. The package combines load analysis, modular MV Drive E-House delivery, EMS measurement, commissioning, performance review and ongoing service.

EaaS MV Drive E-House, EMS and industrial load retrofit concept
01

Baseline first

Confirm load profile, operating hours, tariff and measurement boundary before final commercial commitment.

02

Factory retrofit package

Move MV drive integration, wiring, HVAC/fire checks and FAT into a prefabricated E-House package.

03

EMS-backed M&V

Track kWh, demand, speed, operating hours, alarms, CO2 reduction and verified savings after commissioning.

04

Lifecycle service

Support preventive maintenance, spare parts, troubleshooting, annual performance review and optimization.

Commercial logic

Built around approval, outage control, transparent measurement and stable operation.

The EaaS model is intended for large fan and pump loads where speed control, operating profile and tariff structure can create measurable savings. EHOUSE supports early screening, technical package definition and post-commissioning savings review.

  1. 01

    Screen

    Collect motor data, flow demand, operating hours, tariff and process constraints.

  2. 02

    Business case

    Estimate savings, outage scope, project boundary and measurement approach.

  3. 03

    Package

    Engineer MV Drive E-House, EMS, interfaces, bypass strategy and FAT records.

  4. 04

    Commission

    Install during controlled outage, complete loop checks, SAT and operator training.

  5. 05

    Review

    Compare baseline and actual data, report savings and support lifecycle optimization.